Home Extension Plan: How to Plan a House Extension Properly
A successful home extension begins long before foundations are excavated.
The early decisions determine:
- How much useful space you gain
- Whether the layout works
- What approvals are required
- How the new structure connects to the existing house
- Where drainage and services will run
- How much structural alteration is required
- How easily the project can be built
For older properties in Brighton and Hove, there can be an additional layer of complexity.
The existing house may contain:
The existing house may contain:
- Bungaroosh
- Flint
- Solid brick
- Lime mortar
- Traditional render
- Historic plaster
- Later modern alterations
A good extension plan therefore needs to consider both the new extension and the building it is being connected to.
Step 1: Decide What the Extension Needs to Achieve
Begin with the problem rather than the building shape.
Ask what you actually need.
For example:
- Larger kitchen
- Kitchen-dining room
- Utility room
- Additional bedroom
- Home office
- Ground-floor shower room
- Better connection to the garden
- More storage
- Improved circulation
- Combination of several spaces
The extension should solve a functional problem.
Simply maximising the number of square metres does not necessarily create the best home.
Step 2: Consider Whether You Need an Extension at All
Before committing to additional floorspace, consider whether the existing property could be reorganised more effectively.
Possible alternatives can include:
- Removing or moving an internal partition
- Reconfiguring the kitchen
- Converting an existing garage
- Altering circulation
- Using an underused room differently
An extension makes sense where the additional space genuinely improves the property.
Step 3: Set Your Priorities
Separate requirements into three groups.
Essential
Things the project must achieve.
For example:
- Larger kitchen
- Additional bedroom
- Ground-floor WC
Desirable
Things you would like if budget and space permit.
For example:
- Rooflights
- Large sliding doors
- Utility room
- Bespoke storage
Optional
Items that could be removed without undermining the main objective.
This makes later design and budget decisions considerably easier.
Step 4: Establish an Initial Budget
Your budget needs to cover more than the visible construction.
Potential project costs can include:
- Design
- Surveys
- Planning
- Structural engineering
- Building Control
- Party-wall matters
- Construction
- Kitchen
- Bathroom
- Electrical work
- Heating
- Flooring
- Decoration
- External landscaping
- Contingency
A large kitchen or high-specification glazing package can substantially affect the final project cost even when the building itself remains relatively straightforward.
Step 5: Inspect the Existing Building
The extension does not exist independently from the house.
Before finalising the design, establish the existing building's condition.
Look at:
- Walls
- Roof
- Drainage
- Ground levels
- Cracking
- Damp
- Existing extensions
- Services
- Previous structural alterations
Building a new extension against a defective existing wall does not correct the existing defect.
Step 6: Identify the Existing Wall Construction
This is particularly important in Brighton.
The rear wall of an older property could contain:
- Brick
- Bungaroosh
- Flint
- Mixed masonry
- Later blockwork
The material affects how work such as:
The material affects how work such as:
- Forming openings
- Installing steelwork
- Creating bearings
- Fixing temporary support
- Making good
should be approached.
A plastered wall should not automatically be assumed to be modern brick.
Step 7: Check for Bungaroosh
Bungaroosh is common enough within Brighton's older building stock that it should be considered before major structural alterations.
If a new extension requires the rear wall to be opened significantly, the condition and construction of that wall may materially affect the work.
Potential issues include:
- Irregular masonry
- Voids
- Soft lime-bound material
- Historic alterations
- Limited reliable fixing positions
Step 8: Establish the Site Constraints
The design should respond to the actual property.
Consider:
- Garden depth
- Property width
- Neighbouring extensions
- Ground levels
- Access
- Drainage
- Trees
- Boundaries
- Existing outbuildings
- Orientation
- Conservation status
A design that works perfectly on one Brighton terrace may be inappropriate only a few streets away.
Step 9: Think About Natural Light
Extensions can improve one part of a house while making the original room behind it darker.
Consider:
- Orientation
- Depth of extension
- Rooflights
- Windows
- Internal openings
- Glazed doors
- Ceiling heights
The objective should be to design the extension and original house as one interior rather than treating the new room separately.
Step 10: Consider the View Back Into the Existing House
This is often overlooked.
Most extension drawings concentrate on what you see while looking towards the garden.
Also consider the reverse view.
Ask:
- Does the old house still feel connected?
- Does the original room become a corridor?
- Are structural columns awkwardly positioned?
- Do ceiling changes feel deliberate?
The junction between the old and new spaces often determines whether the extension feels integrated.
Step 11: Decide How Much of the Existing Wall to Remove
A rear extension commonly involves enlarging an existing opening between the house and new structure.
Options can range from:
- Retaining a substantial amount of existing wall
- Enlarging an existing opening
- Creating a wide opening
- Removing most of the original rear wall
The larger the opening, the more significant the structural intervention can become.
The correct decision should balance:
The correct decision should balance:
- Architecture
- Structure
- Cost
- Existing masonry
- Desired layout
Step 12: Structural Design
Where load-bearing walls are altered or new structural elements are required, structural engineering becomes an important part of the project.
Approved Document A provides current statutory guidance for structural requirements including foundations, walls, floors and roofs.
Structural design may involve:
- Steel beams
- Columns
- Padstones
- Foundations
- Roof structure
- Lintels
- Existing-wall assessment
The engineering should be resolved before structural demolition begins.
Step 13: Do Not Assume Steel Bearings Are Straightforward
In uniform modern masonry, structural bearing details can often be relatively predictable.
Traditional Brighton masonry can be more complicated.
If the existing wall is bungaroosh or another mixed construction, the engineer and contractor may need to consider the actual condition of the bearing area rather than relying solely on assumptions from the visible plastered surface.
Controlled opening-up can sometimes be necessary.
Step 14: Temporary Support Needs Planning
Before removing a load-bearing wall, the existing structure needs suitable temporary support.
The method depends on:
- Wall construction
- Floors above
- Roof loads
- Opening width
- Existing masonry condition
Temporary works should be considered as part of the structural operation rather than improvised after demolition starts.
Step 15: Check Whether Planning Permission Is Required
Some house extensions can fall within permitted development rights, provided the relevant limitations and conditions are satisfied.
Government guidance confirms that householder permitted-development rights can allow certain extensions without a full planning application, but those rights are subject to defined conditions and do not remove requirements under other regimes such as Building Regulations or the Party Wall etc. Act.
Never assume “It's only a rear extension, so planning permission isn't required.” Check the actual proposal.
Step 16: Permitted Development Is Not Automatic
Permitted-development rules depend on factors including the nature and dimensions of the proposed extension and the property itself.
The rules can also be affected by:
- Previous extensions
- Listed status
- Conservation controls
- Article 4 Directions
- Other restrictions
Brighton & Hove confirms that Article 4 Directions can restrict permitted-development rights in parts of the city.
The planning status should therefore be established for the individual property.
Step 17: Consider a Lawful Development Certificate
Where you intend to rely on permitted-development rights, government guidance states that it is possible to apply to the local authority for a Lawful Development Certificate to confirm that the proposed development is lawful.
That can provide useful formal evidence of the planning position rather than relying solely on an informal assumption.
Step 18: Planning Permission in Brighton and Hove
Brighton & Hove City Council advises that major changes and new building work are likely to require planning permission, while some development can be carried out under permitted-development rights.
The council also provides specific guidance for householder alterations and extensions.
For proposals where acceptability is uncertain, the council currently offers a household pre-application advice service.
Step 19: Design for the Existing Property
Planning is not purely about whether the extension fits within a dimensional rule.
Brighton & Hove's extension-design guidance emphasises the relationship between the proposal, neighbouring properties and the wider character of the area.
Good design should consider:
- Scale
- Proportion
- Materials
- Roof form
- Windows and doors
- Relationship with the original house
- Neighbouring amenity
The goal should not simply be to build the largest extension physically possible.
Step 20: Conservation Areas
If the property lies within a conservation area, additional planning considerations can apply.
Brighton & Hove specifically notes that conservation-area and Article 4 designations can affect permitted-development rights.
The design may need additional care around:
- External materials
- Roof form
- Windows
- Visibility from the street
- Relationship to historic fabric
Check the designation before assuming an ordinary house-extension approach applies.
Step 21: Listed Buildings
If the property is listed, the situation is different again.
Brighton & Hove states that Listed Building Consent is required for works to alter or extend a listed building where the statutory controls apply, and planning permission may also be required.
The extension design may need to account for:
- Historic layout
- Existing masonry
- Historic render
- Windows
- Internal plaster
- Significant openings
- Architectural details
Step 22: Research Previous Applications
Brighton & Hove's Planning Register allows homeowners to view current and historic planning applications.
Looking at nearby extensions can be useful for understanding:
- Local context
- Previous design approaches
- Common constraints
But a neighbouring approval does not automatically mean the same proposal will be acceptable at your property.
Each application has its own circumstances.
Step 23: Party Wall Matters
The Party Wall etc. Act is separate from planning permission and Building Regulations.
Government guidance states that owners must notify neighbours where proposed work falls within the Act, including certain work to party structures and certain excavation near neighbouring buildings.
This can be relevant to an extension where:
- Foundations are close to neighbouring structures
- A party wall is being altered
- Work takes place on the boundary
Establish the position early rather than waiting until excavation is due to begin.
Step 24: Speak to Neighbours Early
Even where the design is compliant, extensions can affect neighbours during construction.
Early communication can help explain:
- Proposed scope
- Access
- Scaffolding
- Party-wall procedures
- Construction disruption
This does not replace formal notices where they are legally required.
Government guidance specifies formal notice requirements for work covered by the Party Wall etc. Act.
Step 25: Building Regulations
Planning approval does not mean the construction automatically satisfies Building Regulations.
Government guidance expressly distinguishes the two systems and confirms that constructing or extending a building is covered by the Building Regulations 2010.
An extension can engage requirements dealing with matters such as:
- Structure
- Fire safety
- Moisture
- Ventilation
- Drainage
- Energy efficiency
- Electrical work
The applicable requirements depend on the project.
Step 26: Current 2026 Building Standards
The government published new 2026 editions of Approved Documents including Part L for energy performance and Part F for ventilation. Earlier standards can remain relevant to projects falling within transitional arrangements, so the applicable version should be established for the particular project.
This is a good reason not to design an extension around an old specification copied from a previous project.
Step 27: Foundations
The foundation design needs to respond to the site.
Factors can include:
- Ground conditions
- Existing building
- Nearby structures
- Trees
- Drainage
- Proposed loads
The exact foundation design should therefore follow the structural and site conditions rather than being selected purely because a particular depth was used on another extension.
Step 28: Inspect the Existing Foundations Where Necessary
An older property may not have foundations identical to a modern house.
Where the new extension or structural design depends on the existing construction, investigation may sometimes be necessary.
This can help establish:
- Existing depth
- Existing wall arrangement
- Condition
- Relationship with proposed work
Do not make irreversible design assumptions where the existing construction can reasonably be checked first.
Step 29: Drainage
Drainage should be considered before the extension footprint is fixed.
Existing:
- Soil pipes
- Waste pipes
- Gullies
- Manholes
- Underground drains
can conflict with proposed foundations and floor layouts.
Moving drainage after construction begins is considerably more disruptive than incorporating it into the design.
Step 30: Identify Inspection Chambers
A manhole located exactly where the new kitchen island or structural footing is proposed can create an avoidable complication.
Survey drainage early.
The drainage strategy should coordinate with:
- Foundations
- New kitchens
- WCs
- Utility rooms
- Roof drainage
Step 31: Roof Drainage
A larger building footprint creates more roof area.
The extension therefore needs a properly planned rainwater system.
Consider:
- Gutters
- Downpipes
- Outlets
- Existing drainage capacity
- Junctions with the original house
Water should not simply be redirected against the original building.
Step 32: Roof Design
Common extension roofs can include:
- Flat roofs
- Pitched roofs
- Hipped roofs
- Combination designs
The decision affects:
The decision affects:
- Internal ceiling height
- External appearance
- Rooflights
- Drainage
- Junction with the existing building
The roof should be designed as part of the architecture rather than added after the floor plan has already been fixed.
Step 33: Rooflights
Rooflights can be particularly useful for bringing daylight deeper into:
- Kitchen-dining spaces
- Areas close to the original rear wall
- Side-return extensions
Their position should consider:
Their position should consider:
- Structural roof layout
- Furniture
- Kitchen units
- Lighting
- Solar exposure
More glazing does not automatically create a better room.
Step 34: Large Glazed Doors
Sliding and folding doors can create a strong connection with the garden.
Their design affects:
- Structural opening
- Threshold
- Drainage
- Internal layout
- Solar gain
- Heat loss
The exact product dimensions should be known before final structural openings are built.
Step 35: Thresholds
Low thresholds require careful coordination between:
- Internal finished floor
- Door system
- External paving
- Drainage
- Damp protection
If external landscaping is considered only after the extension is complete, it can be difficult to achieve appropriate levels around the new opening.
Step 36: Floor Levels
Decide early whether the new extension floor should align with the existing house.
This affects:
- Excavation
- Insulation
- Finished floor
- Thresholds
- External ground levels
A small mismatch can create an unwanted step exactly where the old and new spaces are intended to feel continuous.
Step 37: Insulation and Thermal Performance
The new extension will need to meet the applicable Building Regulations requirements for energy performance.
The current 2026 Approved Document L supports Part L of the Building Regulations, although transitional standards can apply to earlier projects.
The design should coordinate:
- Walls
- Roof
- Floor
- Windows
- Doors
- Junctions
rather than treating insulation as something to add after the structure is built.
Step 38: Old-to-New Thermal Junctions
The junction between a modern insulated extension and an older solid-wall house deserves particular care.
The two constructions can differ substantially in:
- Wall thickness
- Insulation
- Moisture behaviour
- Surface temperature
Good detailing reduces the risk of awkward cold areas and poorly resolved internal finishes at the junction.
Step 39: Do Not Apply New-Build Assumptions to Traditional Walls
A new extension might use:
- Modern cavity construction
- Modern insulation
- Blockwork
- Modern plaster
while the original house contains:
while the original house contains:
- Bungaroosh
- Lime mortar
- Solid masonry
- Lime plaster
There is no technical reason that both parts must use exactly the same material system.
The junction should be designed so that each construction can perform appropriately.
Step 40: External Render
A rendered extension may use a different system from the original property.
For example: modern blockwork extension — may be suitable for an appropriate proprietary modern render; original bungaroosh wall — may be more appropriately repaired using a compatible lime system.
The colours can still be coordinated.
Step 41: Coastal Exposure
Brighton and Hove's exposed coastal environment should also be considered when specifying:
- Render
- Windows
- External doors
- Metalwork
- Rainwater goods
External materials need to suit both the substrate and exposure.
Step 42: Plan the Kitchen Before Building the Extension
If the extension is principally for a kitchen, the kitchen layout should influence the architectural design.
Establish:
- Island position
- Tall units
- Hob
- Sink
- Fridge
- Dining table
- Lighting
- Doors
- Rooflights
before fixing:
before fixing:
- Windows
- structural columns
- radiators
- electrical points
A kitchen should not be squeezed into a shell designed without reference to it.
Step 43: Plan Bathrooms and WCs Early
If the extension includes a:
- WC
- Shower room
- Utility sink
establish drainage and ventilation routes before foundations and floors are completed.
Moving these later can affect several other parts of the build.
Step 44: Electrical Planning
An extension can require:
- Sockets
- Lighting
- External lighting
- Appliance supplies
- Data
- Smoke alarms
- Heating controls
Electrical positions should be planned against the actual furniture and kitchen design.
The Building Regulations include requirements relating to electrical safety, with the applicable Approved Documents providing current guidance.
Step 45: Heating
Decide how the new space will be heated.
Options may include:
- Radiators
- Underfloor heating
- Other suitable systems
This decision affects:
This decision affects:
- Floor build-up
- Pipework
- Wall space
- Controls
It should be resolved before the floor and finishes are installed.
Step 46: Ventilation
Extensions can alter the ventilation characteristics of the original house.
This becomes particularly relevant where a new kitchen or bathroom is created.
Approved Document F provides the current statutory guidance framework for ventilation in England, with a 2026 edition now published for projects subject to the new standard.
Ventilation should therefore form part of the extension design, not an afterthought once condensation appears.
Step 47: Consider Construction Access
Brighton properties can have restricted access.
Possible constraints include:
- Terraced houses
- No side access
- Basement steps
- Narrow streets
- Controlled parking
- Shared passages
These affect:
These affect:
- Waste removal
- Concrete
- Steel delivery
- Scaffold
- Material storage
Site logistics should be considered when budgeting and programming the work.
Step 48: Material Storage
Extensions require substantial quantities of:
- Blocks or bricks
- Timber
- Insulation
- Plasterboard
- Steel
- Sand
- Mortar
A small Brighton site can become difficult to manage if all materials arrive simultaneously.
Delivery sequencing can improve:
Delivery sequencing can improve:
- Access
- Safety
- Productivity
Step 49: Decide Whether You Will Remain in the Property
Living through an extension is possible, but significant stages can affect:
- Kitchen use
- Heating
- Water
- Access
- Dust
- Security
The programme should establish when the existing house will be opened into the new extension.
Keeping the original rear wall intact for as long as practical can sometimes reduce disruption, depending on the project.
Step 50: Choose the Contractor From the Scope, Not Just the Total
When comparing extension quotations, check whether they include the same work.
Look for items such as:
- Site setup
- Excavation
- Foundations
- Drainage
- Structure
- Steelwork
- Roof
- Windows
- Doors
- Insulation
- Plumbing
- Electrics
- Plastering
- Kitchen work
- Decoration
- Waste
Two \u201cextension quotes\u201d can describe completely different scopes.
Step 51: Identify Client-Supplied Items
Agree clearly who is supplying items such as:
- Kitchen
- Appliances
- Tiles
- Flooring
- Lights
- Sanitaryware
- Doors
Client-supplied items need to be available at the correct stage.
Late product decisions can stop other trades.
Step 52: Finalise Major Products Before Their Openings Are Built
Items such as:
- Sliding doors
- Rooflights
- Kitchen units
- Sanitaryware
should ideally be confirmed early enough for the construction to accommodate their actual dimensions.
Do not rely on approximate catalogue sizes where finished openings depend on them.
Step 53: Allow for Existing-Building Defects
Extensions frequently expose parts of the original house that have been hidden.
Possible discoveries include:
- Weak masonry
- Old openings
- Failed drainage
- Rotten timber
- Inappropriate previous repairs
A reasonable contingency can help manage genuinely concealed conditions.
It should not replace proper surveying.
Step 54: Do Not Automatically Strip the Existing House
An extension does not require the original property to be completely modernised.
Sound:
- Lime plaster
- Masonry
- Joinery
- Render
can often remain.
Only remove existing material where the project or condition genuinely requires it.
Step 55: Build in the Right Sequence
A typical extension may broadly progress through:
- 1Final design
- 2Planning and approvals
- 3Structural design
- 4Building Control arrangements
- 5Party-wall process where applicable
- 6Site setup
- 7Excavation
- 8Foundations
- 9Below-ground drainage
- 10Ground floor
- 11Walls
- 12Structural steelwork
- 13Roof
- 14Windows and external doors
- 15Weatherproofing
- 16First-fix services
- 17Insulation and internal construction
- 18Plastering
- 19Kitchen and bathroom installation
- 20Second-fix services
- 21Flooring
- 22Decoration
- 23External works
- 24Testing and completion
The exact sequence varies, but the underlying principle is to avoid damaging finished work by completing stages in the wrong order.
Step 56: Weatherproof the Extension Before Internal Finishes
Before significant internal finishing begins, the extension should have effective protection from the weather.
That generally means completing the relevant:
- Roof
- Windows
- Doors
- External walls
- Rainwater details
before investing heavily in internal plaster and decoration.
Step 57: Do Not Rush Drying
Construction introduces moisture through materials such as:
- Concrete
- Screed
- Mortar
- Plaster
These materials require appropriate curing and drying.
The final decorating programme should follow the actual materials rather than attempting to force completion by sealing surfaces prematurely.
Step 58: Inspect Before Elements Are Hidden
Some of the most important construction disappears permanently.
Before closing walls or floors, check:
- Structural connections
- Insulation
- Pipework
- Cables
- Waterproofing
- Drainage
- Fixing backgrounds
Photographs of concealed construction can also provide a valuable future record.
Step 59: Keep Construction Records
Useful records can include:
- Approved drawings
- Structural calculations
- Product specifications
- Photographs
- Building Control documents
- Electrical certification
- Guarantees
- Instructions
These can become valuable during:
These can become valuable during:
- Future maintenance
- Sale
- Later alterations
Step 60: Final Inspection and Completion
Before considering the project finished, check:
- Doors and windows
- Plumbing
- Heating
- Electrical work
- Drainage
- Decoration
- External finishes
- Rainwater goods
- Making good
Outstanding items should be recorded clearly.
Home Extension Plan: The Complete Process
A well-organised project can be summarised as:
Phase 1 — Define
Establish:
- What space you need
- Your priorities
- Budget
Phase 2 — Investigate
Check:
- Existing construction
- Bungaroosh or traditional masonry
- Site constraints
- Drainage
- Existing defects
- Heritage status
Phase 3 — Design
Develop:
- Floor plan
- Elevations
- Kitchen or bathroom layout
- Structural concept
- Materials
Phase 4 — Approvals
Establish:
- Planning permission
- Permitted development
- Listed Building Consent
- Building Regulations
- Party-wall requirements
Phase 5 — Technical Design
Resolve:
- Foundations
- Structure
- Drainage
- Insulation
- Roof
- Windows
- Services
- Old-to-new junctions
Phase 6 — Construction
Build in a controlled sequence from:
- Groundworks
- Structure
- Weatherproof shell
- Services
- Internal finishes
Phase 7 — Completion
Finish:
- Kitchen
- Bathroom
- Decoration
- External work
- Testing
- Documentation
Good extension planning means important decisions are made before the relevant part of the building is constructed.
Safe-Bricks' Approach to House Extensions
Safe-Bricks undertakes home-extension construction in Brighton and Hove with particular experience working where modern extensions meet older traditional properties.
Our work can involve:
- Groundworks
- Structural alterations
- Steel installation
- Traditional masonry repairs
- Bungaroosh repairs
- Brick and block construction
- Roofing
- Rendering
- Plastering
- Kitchens
- Bathrooms
- Painting and decorating
The key difference in an older property is understanding that the new extension can be modern construction while the original house may still need traditional repair methods.
Planning a Home Extension in Brighton or Hove?
For an initial extension enquiry, send Safe-Bricks:
- Photographs of the existing property
- Rear and side elevations
- The proposed extension area
- Any existing architectural drawings
- Planning drawings if already prepared
- Structural drawings if available
- Photographs of existing cracks or damp
- Any known bungaroosh or traditional wall construction
- Your intended kitchen, bathroom or room layout
Also tell us where you currently are in the process:
Also tell us where you currently are in the process:
- Initial idea
- Drawings being prepared
- Planning submitted
- Planning approved
- Building Regulations design underway
- Ready for construction
This allows us to understand what information already exists and what still needs resolving before an accurate construction scope can be prepared.